No. of QC Staff
30 to 39
QC Responsibility
In-house
QC/Technical Support
ISO9001:2000
Procedure/Testing Details
The material inspection-procedure inspection-finished product inspection.
Material must be inspected before coming to the factory. Only qualified products are in warehouse. Technical inspector and related instruments test the products. The results are reported to the supplier.
Procedure inspection is to inspect the product during the procedure of producing, and to monitor and test the material, to control the configuration, performance
and customer's need to the product on the production line, then find and solve the problem.
Briefly describe the QC department
Our QC department got 30-35 members, one as leading manager, 10-15 work as the in-coming material, final products inspector to control the material quality and product quality; others work as the production online inspector to control the production process.