LED shoe box light 24-300W LED parking Lot Light with ETL DLCLike
Manufacturer
Product Range Main products
LED flood light,LED wall pack,LED parking lot light,LED shoe box,LED street light,LED tunnel light,LED high bay,LED low bay,led gas station light,led canopy light,LED Garage Light
Target Market(s)North America; Oceania; Southeast Asia; Eastern Europe; Africa(except Middle East); Hong Kong/ Macao/ Taiwan; Latin America; Japan & Korea; Middle East & South Asia; Mainland China; Western & Southern Europe; Northern Europe; Central & Southern Asia; Middle East
Basic Specification
Modle | YR-PL275-24W |
---|---|
Color | black,gray,white |
Led chip | samsung |
Driver | Meanwell driver |
Warranty | 5 years |
Voltage | 90-260V |
Application | Car Park, Garden, Park, Sport Lighting, Sport Yard |
IP | IP65 |
Material | Aluminum, Aluminum Die Casting |
Detail Description
Fetures,
1.Module lens design make the lamp with well suited lighting distributing for LED parking lot lighting;
2.Hollow out heat sink design make the lamp weight lighter and have good heat dissipation;
3.Installation angle -90~+90 is adjustable. Good-looking appearance.Uses 100 lm/w Samsung chips.
4.Lamp luminous dfficiency reaches 90 lm/w;
5.IP65
6.5 kinds of installation brackets.
7.Warranty:Five years
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
Product figure
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
5 kinds of installation brackets
Model | CCT | CRI | Lumious Flux | System Power | Product Size(MM) | Package Size(MM) | Quantity of LED chip | N.G. | W.G. |
YR-PL275-W024-A | 3000-7000K | ≥70 | 2400±600 LM | 24±5W | 275*364*176 | 525*330*115 | 10 pcs | 4.4 KG | 5.1 KG |
Input Voltage: AC 90V~277V | |||||||||
Efficiency of power supply>0.9 | |||||||||
Storage Temperature: –40 ~ 50°C |
Model | CCT | CRI | Lumious Flux | System Power | Product Size(MM) | Package Size(MM) | Quantity of LED chip | N.G. | W.G. |
YR-PL275-W024-B | 3000-7000K | ≥70 | 2400±600 LM | 24±5W | 275*427*90 | 485*330*185 | 10 pcs | 4.0 KG | 4.7 KG |
YR-PL275-W024-D | 3000-7000K | ≥70 | 2400±600 LM | 24±5W | 275*425*144 | 485*330*185 | 10 pcs | 4.2 KG | 4.9 KG |
Input Voltage: AC 90V~277V | |||||||||
Efficiency of power supply>0.9 | |||||||||
Storage Temperature: –40 ~ 50°C |
Model | CCT | CRI | Lumious Flux | System Power | Product Size(MM) | Package Size(MM) | Quantity of LED chip | N.G. | W.G. |
YR-PL275-W024-C | 3000-7000K | ≥70 | 2400±600 LM | 24±5W | 275*434*90 | 485*330*185 | 10 pcs | 4.0 KG | 4.7 KG |
YR-PL275-W024-E | 3000-7000K | ≥70 | 2400±600 LM | 24±5W | 275*436*144 | 485*330*185 | 10 pcs | 4.2 KG | 4.9 KG |
Input Voltage: AC 90V~277V | |||||||||
Efficiency of power supply>0.9 | |||||||||
Storage Temperature: –40 ~ 50°C |
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
Application
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
With multifarious beam angles available
IES.file and dialux simulation service provided.
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
Certificate
DLC certificate information is available on this website:
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
LED shoe box light aging test and water proof test
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
Package
LED shoe box light 24-300W LED parking Lot Light with ETL DLC
Installation Instruction
a.Make sure the power has been turned off before maintenance.
b.Clean the lens cover regularly to maintain high transmission of light.
c.Clean up the dust from the reflector and heat sink regularly to keep sound heat dispersion.
d.Be careful not to use water or corrosive solution for cleaning, preferably with a dry cloth.
e.When install or replace power supply, directly open the back cover with a screwdriver, then remove the power supply. There are three-core cable of AC power, red corresponds to the power of “L”, blue to “N”, and green or yellow to “G ”.
Company imformation
Shenzhen Yaorong Technology Co.,Ltd was established in 2007, covered 10000 square meters.We
are engaged in the integration of LED R&D, production, and sale,which is situated in the national semi-conductor Lighting Industrialization Base---Shenzhen Guangming New District.
Assembly line
Die-casting
FAQ
Question1: What is the minimum order quantity?
Answer:1 pcs per model.
Question2:May I buy samples from you?
Answer:yes,sample available.
Question3:What is your product quantity?
Answer:we have strong quality control team to guarantee our quanlity.
Question4:What certificates do you have?
Answer:CE DLC ETL ROHS
Question5:How long do I need to wait before my goods arrive?
Answer: 5-7 days for air transportation, 3-5 days for international express. 20-40 days for sea transportation.
Question6: How will you deliver my goods to me?
Answer: We always ship by air and sea. In the mean time, we cooperate with international expresses such as DHL, UPS, FedEx, TNT to enable our customers get their goods rapidly.
Contact persen | Jeky Chen |
yrled-4@86yr.com | |
Skype | line:yrled-4 |
13823194155 | |
Tell | 13823194155 |
Additional Information
Payment Terms | L/C, T/T |
---|---|
Minimum Order | 1 |
Lead Time Delivery Time | 7 days |
Sample Available | Yes |
Delivery Details | Sample time: 7~8 daysBulk Delivery time:Depending on the size of the batch |
FOB Port | Shenzhen, |
Loading Info | by sea,by air,by express(DHL,UPS,FEDEX,EMS) |
Packing Info | One piece a box |
Target Market(s) | Africa(except Middle East), Eastern Europe, Latin America, Mainland China, North America, Northern Europe, Oceania, Western & Southern Europe |
About Us
Shenzhen Yaorong Technology CO.,LTD
Shenzhen Yaorong Technology Co.,Ltd,established in 2007,is the high-tech company engaged in R ,produce and sales of LED lighting and the directing member of Shenzhen LED Industry Association.Our company is located in Shenzhen Guangming New District (The National Semiconductor Lighting Industrialization Base),covering 15000㎡ with advanced equipment and experienced workers in departments of moulding,power coating,die-casting,finished production,aging and testing.We're specialized in outdoor lighting products,such as LED flood light,LED wall pack,LED parking lot light,LED shoe box,LED street light,LED tunnel light,LED high bay,LED low bay,etc.And each item can offer to customers with COB or SMD chips optional.More than 20 members in R team and we have 14 patents.We highly depend on independent innovation.We have been approved by ISO 9001:2008 quality assurance system and ISO 14001:2004 environment guarantee syetem.We export led lights to many different areas ,such as America,Europe,Australia,Japan and so on with UL ETL DLC SAA TUV-GS PSE CE ROHS certificates.We always work hard to meet and exceed your expectation with innovation and progress.Looking forward to your enquiry and hope to be partner with you!
General Information
Year of Establishment | 2009 |
---|---|
Capital | US$5 Million - US$10 Million |
Sales Volume | US$10 Million - US$50 Million |
Brand Name |
Yaorong |
Export Information
Export Year | 2009 |
---|---|
Export Percentage | 61% - 70% |
Delivery Time | 9 days |
Minimum Order Quantity | 1 |
Payment Terms | T/T |
Productivity Information
Production Lines | 4 lines |
---|---|
Factory Size | 15000 square meters square meters |
Monthly Capacity | 5000 sets |
Investment on Manufacturing Equipments | US$10 Million - US$50 Million |
No. of Staffs | 101 - 500 People |
No. of R/D Staffs | 11 - 20 People |
No. of Engineers | 11 - 20 People |
No. of QC Staffs | 11 - 20 People |