best promotion price ul listed led strip CE ROHS FCCoutdoor decorationLike
Manufacturer
Product Range Main products
led filament light,led bulb,led corn light,led down light ,COB led spotlight,led candle light,led tube,led panel light,led strip,other led light
Target Market(s)Oceania; Southeast Asia; Eastern Europe; Hong Kong/ Macao/ Taiwan; Latin America; Japan & Korea; Middle East & South Asia; Mainland China; Western & Southern Europe; Northern Europe; Central & Southern Asia; Middle East
Basic Specification
SMD | SMD3528 and 5050SMD |
---|---|
waterproof level | IP20,IP65,IP67,IP68 |
PCB color | white ,black,yellow |
length | flexible led strip for clothes |
product name | ul listed led strip |
Colour | Red |
Light Source | LED |
Voltage | 12V |
Detail Description
Specific description
1,chip:epistar or cree
2,led quantity:30led/m
3,emitting color:Red
4,IP rate:IP67
5,Brightness(LM/m):70-90LM/m
6,power:7.2w/m
7,input voltage:12v/24v
8,size(mm):500*10*2.3mm
9,color avaliable:RED,GREEN,BLUE,YELLOW,WARM,WHITE,WARM WHITE,RGB
10,size avaliable:500*10*1.7mm(IP20), 500*10*2mm(IP63),500*10*2.3mm(IP67),500*10*2.5mm(IP68)
11,waterproof avaliable:IP20(nonwaterproof ),IP65(crystal epoxy waterproof),IP67(hollow tube waterproof ),IP68(solid tube waterproof)
12,led quantity avaliable:300led/m,60led/m,120led/m
Special point
1, long life span,standard warranty 2 years
2,6 Leds cut-able, matched with easy connection accessories
3,No need the constant-current power feed
4,Low power consumption
5,Best choice for holiday season, show and exhibition 's decorating
Related accessory
(applifier,controller,power supply)





Easy installation

professional packing

Advanced equipment





Wide application


Additional Information
Payment Terms | L/C, T/T, Western Union, Money Order, Paypal, Others |
---|---|
Minimum Order | 50rolls |
Lead Time Delivery Time | 3 days |
Sample Available | Yes |
Delivery Details | ul listed led strip,3528 led stripsample lead time:3 days.order delivery time :5 days. |
FOB Port | Shenzhen |
Loading Info | ul listed led strip,Choosing sea transportation if the order big enougn.Choosing express if the order is small.air transportation is available |
Packing Info | ul listed led strip,5M/Roll in Anti-static bag,60rolls in 1 carton. |
Target Market(s) | Africa(except Middle East), Central & Southern Asia, Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Mainland China, Middle East, North America, Northern Europe, Oceania, Southeast Asia, Western & Southern Europe |
About Us
Shenzhen ZDM Opto-Electronics Co., Ltd.
ZDM was establish in 2006 which occupies an area of 5000 square meters.our products(include the LED tube T8 & T5, LED panel, LED ceiling light, LED downlight) are hot sales in china and overseas markets.also our all product are approved by CE, ROHS SGS,TUV etc certificate, besides obtained High tech Enterprises certificates in 2013.To ensure precise and efficient manufacturing of your orders. We've got ISO90001-2008 certificated with imported SMT machines ,soldering machines ,crytal fasten machines and Automatic wire welding machines.And with 100 employees and 3 production lines.We are able to turn out more than USD10 million sales amount. We also have own LED capsulation and R & D department, every quarter we will launch & promote the new model. and these new items can be customized to meet consumer preference in your market .Now here if you are looking for a LED Manufacturer, come on, please contact me and make a visit first at your convenient time, We will aim to pursue a mutual benefits and win-win cooperation!
General Information
Year of Establishment | 2006 |
---|---|
Capital | US$101 Thousand - US$500 Thousand |
Sales Volume | US$5 Million - US$10 Million |
Brand Name |
orilighting |
Export Information
Export Year | 2009 |
---|---|
Export Percentage | 31% - 40% |
Delivery Time | 10 days |
Minimum Order Quantity | 100 |
Payment Terms | L/C T/T Others |
Productivity Information
Production Lines | 6 lines |
---|---|
Factory Size | 5000 square meters square meters |
Monthly Capacity | 15000pcs/month |
Investment on Manufacturing Equipments | US$101 Thousand - US$500 Thousand |
No. of Staffs | 101 - 500 People |
No. of R/D Staffs | 5 - 10 People |
No. of Engineers | 11 - 20 People |
No. of QC Staffs | 5 - 10 People |